12 Questions to Ask Your Contractor Before Signing (With a Free Scope Checklist)

The #1 regret homeowners have after a bad renovation isn't the contractor they chose. It's the questions they didn't ask before signing.

By the time most homeowners realize they're in trouble—missed deadlines, surprise charges, subcontractors they've never met—it's too late to negotiate. The contract is signed. Work has started. Leverage is gone.

The fix is simple, but it requires doing one thing before your first contractor meeting: generating a scope of work that gives you something concrete to ask about. A vague project description produces vague answers. A detailed scope produces real commitments.

Here are 12 questions—grouped by category—that separate contractors worth hiring from contractors worth avoiding.

Scope & Timeline

1. Can you provide a line-by-line bid against this scope?

Why it matters: A real contractor prices work line by line. If they hand back a single number ("kitchen remodel: $38,000"), you have no way to compare bids, spot padding, or verify that they read your scope carefully.

Red flag: "I don't work that way" or "I give lump-sum bids." This contractor is hiding something—either their margins or their uncertainty about what the job actually costs.

Follow-up: "Which line items carry the most price risk, and why?"

2. What specifically is NOT included in this bid?

Why it matters: Exclusions are where bad contractors make their money. Permit fees, debris removal, demo labor, appliance installation—each can be quietly excluded from a bid that looks competitive until work starts.

Red flag: A contractor who can't answer this question hasn't thought through your scope. A contractor who lists too many exclusions is telling you the real price is higher than their number.

Follow-up: "Walk me through what would trigger a change order on this project."

3. What's your realistic timeline, and what could push it?

Why it matters: Every contractor will tell you what you want to hear about timing. What you need to hear is what threatens the schedule. Material lead times, inspection delays, subcontractor availability—these are the real schedule risks, and an honest contractor will name them upfront.

Red flag: "We'll be done in three weeks, no problem." No qualifications, no risk factors mentioned. This contractor is telling you what you want to hear, not what's true.

Follow-up: "Do you have any other projects running concurrently that could affect our timeline?"

Budget & Payment

4. What's your payment schedule, and what does each milestone represent?

Why it matters: Payment schedules are leverage. Once you've released a milestone payment, your leverage over that phase of work is gone. You need to know exactly what "30% at substantial completion" means before you agree to it—not after.

Red flag: Large upfront deposits (more than 10–15% before work starts) or vague milestones like "50% at project midpoint." These protect the contractor, not you. See how scope creep causes the biggest budget overruns.

Follow-up: "Can we tie each payment to a specific, verifiable deliverable rather than a percentage?"

5. How do you handle unexpected cost increases?

Why it matters: Surprises happen in renovation—old wiring, water damage, undersized joists. The question isn't whether they'll occur; it's what your contract requires before money changes hands when they do.

Red flag: "We'll deal with it as it comes" or an open-ended discovery clause with no cap and no notification requirement. You need a written process: notification, documentation, your approval before any extra work proceeds.

Follow-up: "What's the threshold before you're required to get written approval from me before proceeding?"

6. Are permit fees included in your bid?

Why it matters: Permit fees for a mid-size renovation can run $800–$2,500 depending on your city and the scope of work. This is often not included in contractor bids unless you explicitly ask.

Red flag: Any ambiguity here. The answer should be a clear yes or no, followed by an itemization of which permits are required and who pulls them.

Follow-up: "Who is responsible if the work fails an inspection?"

Materials & Quality

7. Can you specify every material by name, grade, and SKU?

Why it matters: "Hardwood flooring" in a bid can mean 3/4" select-grade oak at $6/sqft or engineered wide-plank at $18/sqft. Without specific material specs, the contractor prices what they want to install, not necessarily what you expect to receive.

Red flag: "We'll finalize materials once work starts" or "TBD on selections." That's a blank check for material costs.

Follow-up: "If my material selection changes after signing, how do you price the difference?"

8. Who supplies materials—you or your subs?

Why it matters: General contractors often mark up materials 15–25%. On a $40,000 project, that's $6,000–$10,000 in markup. Knowing who sources what lets you understand how the pricing is structured and where you might have alternatives.

Red flag: A contractor who gets defensive about markup questions. Markup is normal. Hiding it isn't.

Follow-up: "Is there any category where I could save by sourcing materials directly?"

Permits & Insurance

9. Are you licensed in this state and city for this type of work?

Why it matters: Licensing requirements vary by jurisdiction and trade. An unlicensed contractor doing electrical or structural work can invalidate your homeowner's insurance, make your home unsaleable, and leave you with no legal recourse if something goes wrong.

Red flag: Any hesitation. Ask for their license number and verify it with your state contractor board—takes five minutes online and has saved homeowners hundreds of thousands of dollars.

Follow-up: "Can I have the license numbers for your electrician and plumber as well?"

10. What insurance coverage do you carry, and can I see the certificates?

Why it matters: You need two types: general liability (covers damage to your property) and workers' compensation (covers injuries on your job site). Without both, you can be personally liable for accidents that happen during your renovation.

Red flag: "We're covered, don't worry about it." You need the actual certificates showing coverage limits and policy expiration dates, and your address should be listed as an additional insured.

Follow-up: "Do your subcontractors carry their own liability and workers' comp?"

11. Who will be on-site daily—you or a subcontractor?

Why it matters: You're hiring a contractor partly for their judgment and oversight. If the general contractor shows up on day one and then disappears, leaving a rotating cast of subs you've never vetted, the quality and communication you were buying isn't what you're getting.

Red flag: "My crew will handle it." Get specific: which crew members, what are their roles, who is the on-site supervisor every day, and how do you reach them?

Follow-up: "Can you give me the names and contact info for any subcontractors you'll be using?"

12. Can you provide three recent references from comparable projects—and can I see the work?

Why it matters: References from five years ago on a deck don't tell you much about a contractor's current kitchen renovation quality. You want recent work, at a similar scope and budget, where you can talk directly to the homeowner.

Red flag: References who seem coached ("oh, they were great, no problems"), contractors who offer photos but not contact info, or anyone who says they don't have recent references available.

Follow-up: "Did any of these projects have change orders, and how were they handled?"

Why These Questions Work Better With a Scope in Hand

Notice that most of these questions are about specific line items, specific materials, specific processes. Vague questions get vague answers. When you show up to a contractor meeting with a detailed AI-generated scope of work already in hand, two things happen:

  1. Contractors take you seriously—and bid more carefully
  2. Your questions have concrete anchors ("on line 7 of my scope, it says tile demo is included—can you confirm that's in your bid?")

The homeowners who avoid the most costly renovation mistakes don't just ask better questions—they ask them about something specific.

Generate your scope before the first contractor meeting

ScopeStack creates a detailed, market-calibrated scope of work in 2 minutes—line items, material specs, and contractor questions included. Free, no signup required.

Generate My Scope →

Free Contractor Checklist

Want a printable version of these 12 questions—plus space to record each contractor's answers for easy comparison? Enter your email below and we'll send it to you.

Download the free contractor checklist

12 questions, red flags, and a comparison grid — formatted for your first contractor meeting.

No spam. Unsubscribe anytime.

Generate your scope of work in 2 minutes

ScopeStack creates a detailed, market-calibrated scope of work for your renovation—line items, materials specs, red flags, and contractor questions. Free, no signup required.

Try the AI Scope Generator →